I-91 PS Construction
Project Goals and Objectives
· Address wetwell surcharge conditions
o Precipitation events
o Existing pump capacity and PS piping constraints
· Increase the size and flowrate of the pumps
o Existing pumps are constant speed
o New pumps will be variable frequency drive (VFD)
· Increase the size of the containment tanks
o Pump station is located in the MacKenzie Reservoir Watershed
o Operate in series (lead-lag configuration)
· Improved access to pumps for maintenance and repairs
o Better site layout
· Replace aging infrastructure beyond its expected lifecycle
o Increase reliability
o Reduce maintenance
o Reduce (eliminate) operating regular labor, overtime labor and benefits expenses during precipitation events
· Increase the capacity of the standby generator